PASSIVE CLT HOUSES
ARTEM REGART

®
  • House in 1 month
    ASSEMBLY
    Design, production, assembly and launch
  • Eco friendly
    PRODUCTION
    Environmentally friendly passive houses
  • 48 months
    PAYBACK
    Low heating and cooling costs
  • Passive houses
    SUPPORT
    Maintenance, service, insurance, consultations
PASSIVE HOUSE
ARTEM REGART
Passive house must have a closed loop of PIR insulation; do not have cold bridges; have panoramic energy-saving glazing; be sealed; have a supply and exhaust system of forced ventilation with heat and moisture recuperator. Passive house ARTEM REGART saves 95% of heating and air conditioning costs. It pays off in just 4 years. The microclimate that a passive house creates cannot be obtained in any other house
CLT PANELS
CLT - cross laminated timber. This is a heavy-duty structural material with a service life of more than 120 years. CLT panels do not shrink and have excellent soundproofing properties. CLT is the only wooden material from which it is allowed to build multi-storey buildings with a height of 28 m.
With Mini CLT Plants ARTEM REGART you will produce CLT panels for any of architectural projects
COMPANY
ARTEM REGART was founded in 2002
We are a comprehensive engineering company: design office, Mini CLT plants production, own experimental Mini CLT plant, serial passive houses production, technical supervision, teams of installation engineers
Founder & owner ARTEM REGART >>


ASSEMBLING A CLT HOUSE
Houses from CLT are assembled on the land plot by a crane in 3 - 4 days. A team of 3 - 4 workers is needed with minimal experience with hand tools and no experience in assembling similar houses.
It's just like 1,2,3
The price of a finished house with all communications and exterior finishes starts from 600 euros / m2 without taxes
1
passive house DESIGN
2
clt panels Production
3
passive house assembly
4
passive house finishing